Manchester Museum

Manchester Museum

Scope of Works: – The fabrication and erection of the main frame steel work in a restricted Manchester city centre area. The installation of a large amount of secondary steel work. Including link bridge and mezzanine floor in the existing building.

January 2008 – August 2009
£500,000.00
200 ton main frame